| October 27, 2000. Drywall installed everywhere this past week. |
|
(big...
huge...
print)
|
| |
 |
| November 16 +/-, 2000. Drywall is taped and mudded. |
|
(big...
huge...
print)
|
| |
 |
| November 18, 2000. Pam starts tiling the new entryway and woodstove hearth. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. They've torn out the walls on the first floor and finished the trim work. Ready for painting. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. Another picture with the walls torn out. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. Another view of the first floor with the walls torn out. Note here the wooden boxes attached to the two exposed posts. The right box is needed to carry some electrical lines, notably those for the light switch, that had always been there. The left box is there for symmetry. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. A view from the new part of the living room toward the new entrance. Bathroom door on the right. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. A view inside the first-floor bathroom. The vinyl was put down over two weeks ago. In the back is the laundry room. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. They've redone the stairs to the basement, replacing the temporary construction with something more permanent and ready for carpet. |
|
(big...
huge...
print)
|
| |
 |
| December 10, 2000. Vinyl in the basement bathroom was installed over two weeks ago. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Tile floor in entryway was expanded. Note also the boxwork attached to the posts on the left, a little hard to see. We needed to run some wires along the closest post, and needed to box them in. We box in the other post for symmetry. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Tiled entryway in the basement also installed. Sorry about the glitch. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. The cabinet and medicine cabinet are installed. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Doorknobs and related hardware installed. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Cabinets and medicine cabinets, towel holders, etc, are all installed. This bathroom's plubming is also done. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Light fixtures installed, including this ceiling fan. |
|
(big...
huge...
print)
|
| |
 |
| January 10, 2001. Fir patches were applied to places where the posts and beams had been damaged during renovation. The light-colored patch here is a fresh piece of fir. Not ideal, but in many cases the only way to cover old holes or gashes. |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Floor tiles grouted. Now preparing for the wall tiles. |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Built-in entertainment center, living room. (Some junk piled on it.) |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Built-in cabinets for dave's office. |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Built-in shelves in library. Another 3 banks on the other wall. Total 40 shelves. |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Laundry moved! |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. A while ago they framed up this box to cover the wiring next to this post. For symmetry they do it on the other side too. We stained it in an attempt to match post color. |
|
(big...
huge...
print)
|
| |
 |
| January 24, 2001. Basement painted and cleaned up. |
|
(big...
huge...
print)
|
| |
 |
| February 17, 2001. Installed handles on cabinet doors. |
|
(big...
huge...
print)
|
| |
 |
| February 16, 2001. Finished wiring network patch panel. In the middle rack you can see that I've wired several ports together into a 4-conductor bus, for phone and LocalTalk support. |
|
(big...
huge...
print)
|
| |
 |
| February 17, 2001. Installed some wallpaper in Mara's room. |
|
(big...
huge...
print)
|
| |
 |
| February 17, 2001. Installed wallpaper in John's room. |
|
(big...
huge...
print)
|
| |
 |
| February 19, 2001. Plastic door installed in entertainment center. |
|
(big...
huge...
print)
|
| |
 |
| February 20, 2001. Network faceplate installation completed. |
|
(big...
huge...
print)
|
| |
 |
| February 28, 2001. Carpets were installed last week. |
|
(big...
huge...
print)
|
| |
 |
| February 28, 2001. Carpets were installed last week, furniture moved in. |
|
(big...
huge...
print)
|
| |
 |
| February 28, 2001. The basement is really done! Carpets installed last week, furniture installed. |
|
(big...
huge...
print)
|
| |
 |
| March 6, 2001. Woodstove now installed and operational. |
|
(big...
huge...
print)
|
| |